• PVC cube tee.jpg
  • PVC 3D tee.jpg
  • PVC straight tee.jpg
  • PVC corner tee.jpg
  • PVC three-dimensional tee.jpg
PVC THREE WAY ELBOW
  • (ASTM D2466) 1/2'' 3/4'' 1'' 1-1/4'' 1-1/2''
  • Custom colors available

share:

Product details



3-Way PVC Elbow Fittings connect three pipe pieces to create corner junctions in projects, structures, and PVC plans. 3-Way corner fittings accept three segments of the same size PVC pipe, all at 90-degree angles to each other.

PVC 3D tee.jpgPVC cube tee.jpg
PVC straight tee.jpgPVC three-dimensional tee.jpg



Application

Construction pipeline system
Agricultural irrigation pipeline system

Pool pipeline system
Industrial pipeline system
Water treatment pipeline system
Fishery aquaculture pipeline system


Advantages

The characteristics of PVC material: stable physical properties, 

and not suitable for acid and alkali corrosion, relatively heat-resistant. 

By adding different additives, PVC materials can present different physical 

and mechanical properties.




Installation & Testing


① Pipe cutting: according to the use requirements, after measuring the appropriate length, the required pipe

 can be cut by hand or machine. When cutting, keep both ends vertical and flat, and use a file to cut 

Deburring and sharp edge, but the chamfer should not be too large.


② Bonding of pipes and fittings: before bonding, trial assembly must be carried out, installation position must 

be determined and marked, length of inserted pipe end (socket depth + 10mm) and inner wall of socket of 

pipe fittings shall be cleaned,Then wipe with cotton yarn stained with acetone. After acetone volatilizes, evenly

 brush the adhesive on the outside of pipe end and inside of socket. It should not be too thick, but it should 

not be missed. Insert after painting and rotate. To the ideal combination angle required for installation, make 

all the pipes inserted into the socket, fix them by themselves after about 2 to 3 minutes, and wipe off the 

excess adhesive overflowing from the bonding place to keep the pipe clean. Now cut.Do not force to open 

or rotate the direction, otherwise it will cause leakage. The adhesive component shall not be subjected to

 external force within 1 hour, and shall not be watered within 24 hours. The test can be conducted only after

 the curing time is completed.


③ The pipeline installation must have a reliable seal to ensure that there is no leakage in the process of use.

 Fixing devices (pipe clamps) shall be installed every 1.5m to 2.0m.


④ Because the plastic pipe has certain plasticity, when the horizontal pipe is installed, the bracket or elevator

 is set every 0.6m to prevent the plastic pipe from deformation and affect the use.


⑤ The water supply pipe shall be far away from the heat source, and the clear distance between the riser and

 the stove edge shall not be less than 400mm, and the clear distance between the riser and the heating pipe 

shall not be less than 200mm.


⑥ After construction, the pipe can be sealed with soil only after passing the pressure test.


⑦ Please refer to the relevant construction specifications of the Ministry of construction for specific 

installation and use.



Please feel free to give your inquiry in the form below.We will reply you in 24 hours.