• PVC flange.jpg
  • PVC flange picture.jpg
  • PVC loose Flange.jpg
  • PVC backing flange.jpg
Flange
  • (ASTM D2467) 1/2'' 3/4'' 1'' 1-1/4'' 1-1/2'' 2'' 2-1/2'' 3'' 4'' 6'' 8'' 10'' 12'' 14'' 16''
  • Dark gray

share:

Product details

PVC backing flange.jpgPVC flange picture.jpg
PVC flange.jpgPVC loose Flange.jpg



Key Advantages of SCH 80 PVC Fittings


1. Superior Wall Thickness & High-Pressure Rating

Schedule 80 fittings are engineered with significantly thicker walls compared to Schedule 40. 

This robust construction allows them to handle higher internal water pressures and industrial 

fluid loads, making them ideal for heavy-duty process piping.



2. Exceptional Chemical & Corrosion Resistance 

Manufactured from premium, unplasticized polyvinyl chloride (UPVC), these fittings are 

chemically inert. They resist acids, alkalis, salts, and corrosive fluids, preventing rust, pitting, 

and scaling in harsh chemical processing environments.



3. High Structural Integrity & Durability 

The heavy-duty design provides high impact resistance and minimizes the risk of physical 

deformation or cracking under structural stress or shifting soil in underground installations.


4. Excellent Temperature Tolerance 

SCH 80 PVC maintains its structural strength and pressure rating at temperatures up to 

140°F (60°C), perfectly satisfying the requirements of most industrial cold fluid applications.


5. Smooth Internal Bore for Optimum Flow 

 The smooth interior surface reduces fluid friction, minimizes pressure drops, and prevents

 sediment buildup, ensuring maximum flow efficiency and lower maintenance costs over time.



Installation Notes


SCH 80 PVC fittings are designed for solvent cement (socket weld) connections. 

Proper installation ensures leak-free performance at full rated pressure:


Cut the pipe square and clean the ends


Chamfer the pipe end to prevent cement from being pushed out


Clean both the pipe OD and fitting socket with PVC primer/cleaner


Apply solvent cement evenly to both surfaces


Insert the pipe fully into the socket with a slight twist


Hold for 15–30 seconds to allow initial set


Allow adequate cure time before pressurizing (varies by size, temperature, and humidity)


For threaded connections, only Schedule 80 or heavier pipe should be threaded 

(Schedule 40 walls are too thin). Use PTFE tape or thread sealant compatible with PVC.


Please feel free to give your inquiry in the form below.We will reply you in 24 hours.