Product details

Application


Construction pipeline system

Agricultural irrigation pipeline system


Pool pipeline system

Industrial pipeline system

Water treatment pipeline system

Fishery aquaculture pipeline system

Advantages


The characteristics of PVC material: stable 

physical properties, and not suitable for

 acid and alkali corrosion, relatively

 heat-resistant. By adding different additives,

 PVC materials can present different physical and 

mechanical properties.

1:  Benefits

2: Long service life  

3: Eelectrical insulation

4: Good heat preservation

5: Good chemical resistance

6: Easy to operate

7: Light in weight


Installation & Testing

① Pipe cutting: according to the use requirements, after measuring the appropriate length, the required pipe can be

 cut by hand or machine. When cutting, keep both ends vertical and flat, and use a file to cut Deburring and sharp 

edge, but the chamfer should not be too large.

② Bonding of pipes and fittings: before bonding, trial assembly must be carried out, installation position must be

 determined and marked, length of inserted pipe end (socket depth + 10mm) and inner wall of socket of pipe fittings

 shall be cleaned,Then wipe with cotton yarn stained with acetone. After acetone volatilizes, evenly brush the adhesive

 on the outside of pipe end and inside of socket. It should not be too thick, but it should not be missed. Insert after

 painting and rotate. To the ideal combination angle required for installation, make all the pipes inserted into the

 socket,fix them by themselves after about 2 to 3 minutes, and wipe off the excess adhesive overflowing from the 

bonding place to keep the pipe clean. Now cut.Do not force to open or rotate the direction, otherwise it will cause 

leakage. The adhesive component shall not be subjected to external force within 1 hour, and shall not be watered

 within 24 hours. The test can be conducted only after the curing time is completed.

③ The pipeline installation must have a reliable seal to ensure that there is no leakage in the process of use. Fixing 

devices (pipe clamps) shall be installed every 1.5m to 2.0m.

④ Because the plastic pipe has certain plasticity, when the horizontal pipe is installed, the bracket or elevator is set 

every 0.6m to prevent the plastic pipe from deformation and affect the use.

⑤ The water supply pipe shall be far away from the heat source, and the clear distance between the riser and the 

stove edge shall not be less than 400mm, and the clear distance between the riser and the heating pipe shall not

 be less than 200mm.

⑥ After construction, the pipe can be sealed with soil only after passing the pressure test.

⑦ Please refer to the relevant construction specifications of the Ministry of construction for specific installation and use.