Product details
![]() | ![]() |
Industrial Single Union Ball Valve — Features, Applications & Installation Guide
I. Key Features 1: Single Union Design — One-end union connection allows quick disassembly for maintenance without breaking the entire pipeline 2: Chemical Resistance — UPVC/PVC/CPVC body + PTFE seat + EPDM O-ring, resistant to acids, alkalis, and salts 3: Quarter-Turn Operation — 1/4 turn (90°) handle for full open/close, low operating torque 4: Full Bore — Ball bore matches pipe diameter, minimizing flow resistance 5: Lightweight — Significantly lighter than metal valves, easy to install, rust- and corrosion-free 6: Pressure & Temperature Ratings — PN10 (10 bar / 150 psi); UPVC rated for -10°C to 60°C, CPVC up to 93°C 7: Reliable Sealing — PTFE + EPDM dual seal, zero leakage 8: Bidirectional Sealing — No flow direction required; seals effectively in either installation direction 9: Comprehensive Size Range — 1/2" to 4", available in solvent weld (Slip) and threaded (BSP/NPT) connections |
II. Applications![]() |
III. Installation Instructions Solvent Weld Installation: 1: Cut the Pipe — Use a pipe cutter or fine-toothed saw to cut the pipe squarely; the cut must be clean and even 2: Remove Burrs — Use a file or deburring tool to clean internal and external burrs; chamfer the edge at approximately 15° 3: Dry Fit — Insert the pipe without cement to verify depth and alignment; mark the insertion depth with a marker 4: Clean Surfaces — Wipe the pipe exterior and valve socket interior with a dry cloth to remove dust and grease 5: Apply Primer — Apply PVC primer (purple) evenly to the pipe exterior and valve socket interior to soften the surfaces 6: Apply Cement — While the primer is still wet, apply a thick coat of PVC cement to the pipe exterior and a thin coat to the socket interior 7: Insert & Rotate — Immediately push the pipe fully into the socket while rotating 1/4 turn to distribute the cement evenly 8: Hold for 30 Seconds — Maintain firm pressure for 30 seconds to prevent the pipe from backing out before the cement sets 9: Wipe Off Excess — Remove any cement squeezed out at the joint with a cloth 10: Curing Time — Allow at least 15 minutes before moving the assembly; wait 24 hours before pressurizing the system 11: Tighten the Union — Hand-tighten the union nut only; do not use a wrench, as over-tightening may crack the fitting Threaded Installation: 1: Wrap Teflon tape around the threaded end, 3–5 turns in the direction of the thread 2: Hand-tighten the valve onto the threaded end, then use a wrench for an additional 1/4 turn 3: Do not over-tighten — plastic threads are prone to cracking |
IV. Precautions 1: Ensure the pipeline is shut off and depressurized before installation 2: Allow sufficient clearance for the handle to rotate 90°; verify full open/close operation after installation 3: Leave wrench access space at the union nut for future maintenance and disassembly 4: Keep cement and primer away from the ball and internal seals 5:Recommended installation temperature: above 5°C; low temperatures will extend curing time 6:The ball valve is bidirectional, but position it so the handle is easy to operate |











