Industrial Single Union Ball Valve — Features, Applications & Installation Guide

2026-05-12 click:78

I. Key Features


1: Single Union Design — One-end union connection allows quick disassembly for maintenance without breaking the entire pipeline

2: Chemical Resistance — UPVC/PVC/CPVC body + PTFE seat + EPDM O-ring, resistant to acids, alkalis, and salts

3: Quarter-Turn Operation — 1/4 turn (90°) handle for full open/close, low operating torque

4: Full Bore — Ball bore matches pipe diameter, minimizing flow resistance

5: Lightweight — Significantly lighter than metal valves, easy to install, rust- and corrosion-free

6: Pressure & Temperature Ratings — PN10 (10 bar / 150 psi); UPVC rated for -10°C to 60°C, CPVC up to 93°C

7: Reliable Sealing — PTFE + EPDM dual seal, zero leakage

8: Bidirectional Sealing — No flow direction required; seals effectively in either installation direction

9: Comprehensive Size Range — 1/2" to 4", available in solvent weld (Slip) and threaded (BSP/NPT) connections


Industrial grade pvc ball valve.jpgIndustrial grade pvc double union ball valve.jpg

II. Applications


123.png


Industrial grade pvc single union ball valve.jpgIndustrial grade cpvc ball valve.jpg



III. Installation Instructions


Solvent Weld Installation:

1: Cut the Pipe — Use a pipe cutter or fine-toothed saw to cut the pipe squarely; the cut must be clean and even

2: Remove Burrs — Use a file or deburring tool to clean internal and external burrs; chamfer the edge at approximately 15°

3: Dry Fit — Insert the pipe without cement to verify depth and alignment; mark the insertion depth with a marker

4: Clean Surfaces — Wipe the pipe exterior and valve socket interior with a dry cloth to remove dust and grease

5: Apply Primer — Apply PVC primer (purple) evenly to the pipe exterior and valve socket interior to soften the surfaces

6: Apply Cement — While the primer is still wet, apply a thick coat of PVC cement to the pipe exterior and a thin coat to the socket interior

7: Insert & Rotate — Immediately push the pipe fully into the socket while rotating 1/4 turn to distribute the cement evenly

8:Hold for 30 Seconds — Maintain firm pressure for 30 seconds to prevent the pipe from backing out before the cement sets

9: Wipe Off Excess — Remove any cement squeezed out at the joint with a cloth

10: Curing Time — Allow at least 15 minutes before moving the assembly; wait 24 hours before pressurizing the system

11: Tighten the Union — Hand-tighten the union nut only; do not use a wrench, as over-tightening may crack the fitting


Threaded Installation:

Wrap Teflon tape around the threaded end, 3–5 turns in the direction of the thread

Hand-tighten the valve onto the threaded end, then use a wrench for an additional 1/4 turn

Do not over-tighten — plastic threads are prone to cracking


Industrial grade upvc ball valve.jpgIndustrial grade cpvc double connector union ball valve.jpg


IV. Precautions


1: Ensure the pipeline is shut off and depressurized before installation

2: Allow sufficient clearance for the handle to rotate 90°; verify full open/close operation after installation

3: Leave wrench access space at the union nut for future maintenance and disassembly

4: Keep cement and primer away from the ball and internal seals

5: Recommended installation temperature: above 5°C; low temperatures will extend curing time

6: The ball valve is bidirectional, but position it so the handle is easy to operate